NNY - PLOT

Setback Each plot requires a 3 meters setback (means each plot must be two meters away from the road) and a 2 meters setback from an adjacent building. PLOT RATIO Plot Ratio is the ratio of the size of a plot of land to the amount of floor area that can be built on it. In Neo New York, the maximum plot ratio of 1 plot is less than or equal to 3, detailed data are as follows: 1 plot≤3 2 plots≤4 3 plots≤5 4 to 8 plots≤10 9 to 15 plots≤15 16 to 24 plots≤20 25 plots and above≤25